Production process
Basic information
Cost of electric power for 1 m2 | 0,48 kWt |
Materials | portland cement M400,sand, additives, pigments, water |
Productivity of SISTROM per shift | 100 m2 |
Characteristics of the production
Productivity of the line
Facing tile | from 40 to 500 m2 of tiles per shift |
Sidewalk tile | from 40 to 500 m2 of tiles per shift |
Texturized brick | 2000 units per shift |
Production area | from 100 m2 |
Technological process
1. Preparation of moulding mixture |
2. Preparation of a cassette |
3. Holding for 24 hours |
4. After 24 hours |
5. Removal of products |
6. Packing
|
7. Transportation
|
8. Laying
|